Thursday, March 12, 2009

Wiring...

Well, today started off with Bradley making me an egg, a couple pieces of toast, and an apple for breakfast...


Last night, we were able to get the wires pulled through the conduit to the kitchen island, and today, I finished putting them in place where I can find them after the drywall, etc, is in place.  There are internet cables, video cables, and speaker wires -- so that we can put a unit on a shelf under the table that will be on the back side of this L shaped island, and have the TV on the wall, and speakers in the walls.  Hey, my wife will be spending enough time in the kitchen to deserve some luxury while she makes dinner for me ;)


Next, I put one of the central vacuum inlets up so I could see how much work these are going to take..  It wasn't really too bad.  This one actually has an inlet in the bedroom on one side of the wall in the in the hallway on the other side -- using a T.



Here is a picture of the wiring in the "control room" or "server room" -- not sure what to call it, but it is where the phone, internet, and satellite come into the house, and are distributed from there.  It also gives me a place to put computer servers, etc.



And, as I've mentioned before, I have two subpanels for internet cables upstairs so that I didn't have to use nearly as much of the internet cable...  I've had them put an outlet beside each, and I'll have a simple switch or a router there, connecting whatever wires we want to use...



We have now wired almost all of the internet cable, and all but three of the video cables.  We have some phone to wire, and several rooms need to have the speaker wire run...  But, we are definitely getting there...

No comments: