I have some pictures today -- just of the water heater hooked up and with the recirculating hot water line going into the bottom and also the hot water assist from the geothermal unit which also goes into the bottom -- both have a check valve to prevent them from affecting each other.
We are using the boiler drain to get at least very warm water, so that is good...
Work on the septic system is continuing today, and we made an adjustment to the stairway that was going to be required to pass the inspection.
The inspector was very reasonable, but I can't expect him to break code for me... I have a couple of headers over wide windows on the end wall and one door with a more than six foot header that need some modifications. Apparently, the code changed in 2006 requiring double 2x4 jacks on each end of the headers that are more than six feet long. There are a couple of solutions, and we are looking for the easiest and cheapest that will satisfy the inspector...
Other than that, I think we'll be ok with the inspection -- of course, I didn't ask him to do a full inspection, so I guess I'll find out when he does.
Wednesday, March 4, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment