Well, we are now ready for pre-slab inspection so that we can get the slab poured. We'll be pouring the garage slab first, and then the house slab afterward as it will overlap the garage slab by about 4 inches.
The Wenig's have finished the radiant tubing today, and found an error in two of my vacuum tubes, and they moved them for me. I had to run to Lowe's to get the parts I needed, and Gary opened up the area, and dug the stone out so that he could fix the problem for me.
Here are the latest pictures. The area for the heating and A/C unit has several pipes that need to connect between the storm cellar and the machine room. They have put several PVC sleeves between those two areas as you can see in the third picture.
Monday, October 6, 2008