We had several contractors here today -- Wenig's filled the geothermal lines with fluid, and connected the geothermal to the furnace. The radiant heat lines are connected to valves, but not connected to the tank yet.
The Watkin's finished getting the electric ready for rough-in inspection, so that is major progress...
Wren's Plumbing guys were out here to get things almost ready for their rough-in inspection, but we have a little more to do on Monday.
Here are pics of the plumbing manifold, the furnace and the geothermal lines connected to it, a refrigerator someone at church is letting us use temporarily, the water heater and radiant heat tank with the radiant heat pipes connected downstairs, and the tub/shower and shower with the hardware attached. The water heater is actually not connected yet, but should be ready on Monday.
After those, we took some pictures of the lamas across the road. There is one baby that has a green blanket over it right in the middle if you can make it out...